Daily Prep - Wednesday, 2026-06-10

Today’s Targets Completed

DSA - 3 Problems (Striver SDE Sheet Day 10)

System Design - 1 Topic


End Of Day Reflection

  • Day 10 of the SDESheetChallenge by takeUforward completed! Smashed 3 core SDE sheet Linked List problems.
  • Mastered Remove Nth Node From End of List (Medium) using the two-pointer (fast/slow) approach to locate the target node preceding it in a single pass.
  • Solved Delete Node in a Linked List (Medium) in time by copying the next node’s value and skipping it, and Add Two Numbers (Medium) using a standard pointer traversal with a carry-over accumulator.
  • System Design: Revised foundational technologies including caching patterns, load balancers, and message queue architectures.

Next Day Goal

  • Continue SDE Sheet Linked List section.
  • System Design: Study replication architectures and database sharding.